Skip to content

Ný Engineering sp. z o. o. is engineering conuslting company run by Katarzyna Mazur-Pytlowany, civil engineer with over 16 years of international experience in the fields of transmission line design, substation design and structural analysis.

Company is specialtised in design of OHTL transmission lines between 110 kV up to 420 kV, latticed structures for transmission lines, line routing, foundation design and prototype testing, tendering and project management.

Key personel of the company has been working for the Transmission System Operators in Scandinavia such as Svenska Kraftnat , Statnett, Energinet and Landsnet, furthermore delivered complex projects for the African Region Tanzania, Mozambique or Ivory Coast.

Ný Engineering team is focused on challenging problems in overhead transmission line projects, solving non standard tasks, assisting customer with various solutions, necessary to deliver on time and with optimal output. 

List of projects with the participation of our designers:

2022

 400kV & 220kV Odensala ledningsåtgärder. Odensala substation. Norconsult Sweden, Iceland and Poland.

132kV fjordcrossing Saltstraumen. Norconsult in Norway.

132kV Vagle transofrmatorstasjon. Work carried for Lyse Elnett in Norway/ Norconsult in Norway.

2020-2022

130kv Hedenlunda – Oxelösund.  Vattenfall Eldistribution Norcosnult in Sweden, 

400kV Barseback-Sege. Work carried for Svenska Kraftnät / Norconsult in Sweden.

132kV Ølen – Bratthammar. Work carried for Haugaland Kraft / Norconsult Nett in Norway.

132kV Rød  transformatorstasjon. Work carried for Lede (former Skagerak Nett) / Norconsult in Norway.

66kV /  47 kV Hamang. Work carried for Elvia / Norconsult Norway.

400kV CL14 Långbjörn-Storfinnforsen overhaed transmission line. Work carried for Svenska Kraftnät / Norconsult in Sweden.

110 kV line from Dondo -Beira. Work carried for Mozambique Utility EdM / Norconsult Mozambique.

132kV Kvandal – Kanstadbotn OTHL. Work carried out for  Statnett in Norway/ Norcosult in Iceland.

130kV Kil – Munkfors. Work carried out for  Ellevio / Norconsult in Sweden.  

400 kV, CT63 Tuna overhead power line. Work carried out for  Svenska Kraftnät/ Norconsult in Sweden. 

400 kV, FT14 Hageskruv overhead power line. Work carried out for  Svenska Kraftnät/ Norconsult in Sweden.

400 kV, FT81 Hall overhead power line. Work carried out for  Svenska Kraftnät/ Norconsult in Sweden.

2018-2020

420 kV Balsfjord Substation.  Work carried out for  Statnett./ ULF Kivijervi in Norway.

150/11 kV Rengård Substation. Skellefteå Kraft / Norconsult in Sweden.

400kV Barsebäck-Sege and rebuilding of line atHjärup . Work carried out for  Svenska Kraftnät/ Norconsult in Sweden.

132 kV Rod Substation. Skagerak / Norconsult in Norway.

the 400 kV line Landersupgård – Fraudge Connection. Work carried out for  Energinet, Denmark / Norconsult in Iceland.

420 kV Skillemoen SVS Substation. . Work carried out for ABB / Statnett in Norway. 

130kV Öja – Ugglarp – Ängelholm overhead transmission line. Cteam Consulting und Anlagenbau GmbH/ E.ON Sweden. / Norconsult Poland.

130kV Bjärnum overhead transmission line. Work carried for CTEAM in Germany.

130 kV Stigshöjden. Work carried out for OMEXOM (Eitech Engineering AB)/ Norconsult in Sweden.

400kV Porjus- Storfinnforsen and Grundfors- Storfinnforsen. Work carried out for Svenska Kraftnät / Norconsult in Sweden.

145kV Kinierezi 1 overhead transmission line in Tanzania. Work carried out for Jacobsen Elektro, Norway/ Norconsult Poland.

420kV/ 145 kV Skillemoen and Balsfjord substation.  Work carried for Jacobsen Elektro / Statnett / Norconsult Poland.

2x400kV line within Nuclear Power Plant Ringhals. Structural design. Work carried for Vattenfall Ringhals AB / Norconsult in Sweden.

400 kV CL54 S1-6 Snösätra-Ekudden. 2x400kV+130kV overhead transmission line in Sweden. Work carried for Rejlers, Sweden/ Norconsult Poland.

Adaptation of 100m crossing tower for 2x130kV (6 phases) use. Work carried for Linjeteknik/ Svenska Kraftnät, Sweden/ Norconsult in Iceland.

400kV CL14 Långbjörn-Storfinnforsen overhaed transmission line. Work carried for Svenska Kraftnät / Norconsult in Sweden.

2017/2018

150kV Kupang substation in Indonesia. Work carried out for Jacobsen Elektro, Norway/ Norconsult Poland.

225kV Buchanan – Monrovia – Mano, Liberia (219 km). Project management work. Work carried for NCC, India/ Norconsult in Iceland.

220kV Kinyerezi overhead transmission line in Tanzania. Work carried out for Jacobsen Electro, Norway/ ARA Engineering, Iceland

132kV tensions towers in E14 at Sundsvall. Design of latticed steel towers. Work carried for Trafikkverket/Norconsult in Sweden/ ARA Engineering, Iceland

132kV Kvandal-Kanstadbotn, new transmission line. Work carried for Sweco/ Statnett in Norway/ ARA Engineering, Iceland.

300 kV Breivik – Lille Sotra. Work carried out for BKK, Norway/ ARA Engineering, Iceland.

420kV Honna stasjon. Realization engineering support in building terminal towers and installation of the conductors. Work carried for Sweco/ Statnett in Norway/ ARA Engineering, Iceland.

2×130 kV Tomelilla – Ö Herrestad – Borrby. Work carried for Linjeteknik AB / E.ON Elnät Sverige AB, Sweden/ ARA Engineering, Iceland.

132 kV Kinyerezi 1 overhead transmission line in Tanzania. Work carried out for Jacobsen Electro, Norway/ ARA Engineering, Iceland.

Finite Element Analysis of a Fibre Reinforced Polymer composite platform for live line work. Work carried for Hydro One in Canada. 

2016

225kV Design of terminal end towers. Work carried for Svenska Kraftnät and ÅF Industry, Sweden/ ARA Engineering, Iceland.

2x225kV Transco CLSG Interconnection Project: Ivory Coast – Liberia – Sierra Leone-Guinea/ ARA Engineering, Iceland. 

132 kV Kinyerezi 1 overhead transmission line in Tanzania. Work carried out for Jacobsen Electro, Norway/ ARA Engineering, Iceland.

220kV Kinyerezi 1 to 2 overhead transmission line in Tanzania. Work carried out for Jacobsen Electro, Norway/ ARA Engineering, Iceland.

420kV Snilldal – Surna 63km of overhead transmission line in Norway. Work carried for Statnett, Norway/ ARA Engineering, Iceland.

2×130 kV Nysäter-Jenåsen Two double circuit, latticed towers. Sweco Energuide, Sweden

2015 – 2016

420kV Lyse – Støleheia. Design of towers and foundations for overhead transmission line, Jøsok Prosjekt/ Statnett, Norway/ ARA Engineering, Iceland.

2016

420kV Brokke – Holen. Work carried for Statnett, Norway/ ARA Engineering, Iceland.

2015

420kV Hofstad-Åfjord, overhead transmission line in Norway. Work carried for Statnett, Norway/ ARA Engineering, Iceland.

2015

420kV Kozienice-Siedlce Ujrzanów. ELFEKO/ PSE National Power Grid in Poland/ ARA Engineering, Iceland.

2015- 2016

110kV Biłgoraj-Nisko. PGE, Poland/ARA Engineering

2015

400kV Honna station. Sweco/Agder Energi. /ARA Engineering

2014

220 kV Krångede Gammeläng,, Norconsult Sweden /ARA Engineering

2014 – 2015

2x66kV Terminal (cable termination) for substation in Verdal, Statnett Norway /ARA Engineering

2013 -2014

130 kV Korsberga-Täppan: structural design of end-tower, Pöyry Sweden /EFLA Consulting Engineers.

2013

130 kV Kärrap – Klerebo: structural design of tension tower, Pöyry Sweden /EFLA Consulting Engineers. 

2013

110 kV: Gransking-Ingby: special end-gantry, Pöyry Sweden /EFLA Consulting Engineers.  

2013

130 kV Gideå-Backa: two substation gantries, Pöyry Sweden /EFLA Consulting Engineers.  

2013

400kV Ombyggnad-Hagby redesign of tower structures, Pöyry Sweden /EFLA Consulting Engineers.  

 2013

220 kV model of giant human pylon Choi+Shine architects. Work carried for Landsnet, Iceland /EFLA Consulting Engineers.

 2013

110 kV Åland three types of tension tower. Pöyry Sweden /EFLA Consulting Engineers.  

 2013

130 kV Korsberga-Gällö three tension towers. Pöyry Sweden /EFLA Consulting Engineers.  

 2013

130 kV Tingsbacka special cable-end tension tower. Pöyry Sweden /EFLA Consulting Engineers. 

2010 – 2013

400 kV Miłosna-Siedlce Ujrzanów transmission line, Poland Work carried out for PSE, Poland /EFLA Consulting Engineers.

2011 – 2012

2x110kV Pawłowice-Brennik transmission line, Poland. Poland. /EFLA Consulting Engineers.

2011 – 2012

Double circuit 300kV DC transmission line tower design in Nässjö-Värnamo. Work carried for Vattenfall Power Consultants.

2011 – 2012

2x110kV and 1x110kV Sochaczew-Grodzisk line. Work carried for Selpol S.A., Poland. /EFLA Consulting Engineers.

2009 – 2010

2x 400 kV transmission line Stenkullen-Lindome in Sweden. Work carried for Vattenfall Power Consultants. /EFLA Consulting Engineers.

2009 – 2010

110 kV/ 2×110 kV Namysłów-Oleśnica transmission line, Poland. Work carried out for EnergiaPro Wrocław and EnergiaPro Opole, Poland. /EFLA Consulting Engineers.

2009 – 2010

110 kV Boguszów transmission line, Poland. Work carried out for EnergiaPro, Walbrzych, Poland. /EFLA Consulting Engineers.

2009 – 2010

2x400kV / 2x220kV 4 circuit transmission line, Plewiska – Kromolice, Poland. Work carried out for SELPOL Projekt, Lodz, Poland. /EFLA Consulting Engineers.

2009 – 2010

Initial design of latticed towers in double circuit 400 kV + 110kV line Wroclaw-Świebodzice. Work carried out for SELPOL Projekt, Lodz, Poland. /EFLA Consulting Engineers.

2009

400kV transmission line Ełk-Rutki. Feasibility study. Work carried for PSE, Poland.  /Línuhönnun

2008

Design of latticed gantries in Wroclaw 110/220 kV substation. Work carried out for SELPOL Projekt, Lodz, Poland. /Línuhönnun

2007

Various works in the field of transmission line design for following projects:
400-110 kV Línuhönnun, Iceland.